Summer land Marina
Additional Information :
| Project Status | Completed |
| Dredging Volume | 55,000m3 |
| Sand Sea band at a depth ranging | 4.00m CD to -9.00m CD Below sea bed, Dredged material was clean sand and disposed either at the beach or in sea area adjacent to the site |
| Quay wall | 550m |